Commit Graph

6 Commits

Author SHA1 Message Date
125dee22f0 fix(ci): allow image fallback on legacy runners
All checks were successful
Test and deploy / Verify production build (push) Successful in 8m54s
Test and deploy / Deploy production (push) Successful in 1m14s
2026-09-10 12:05:52 +03:30
78f385fb30 fix(ci): install Sharp platform dependencies
Some checks failed
Test and deploy / Verify production build (push) Failing after 3m33s
Test and deploy / Deploy production (push) Has been skipped
2026-09-10 11:51:58 +03:30
d42ff4aeb6 ci: use Liara mirror for dependency checks
Some checks failed
Test and deploy / Verify production build (push) Failing after 6m12s
Test and deploy / Deploy production (push) Has been skipped
2026-09-10 11:37:51 +03:30
b4426400f3 ci: align deployment workflow with Gitea
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
Use native Gitea contexts, audit the full dependency tree, and document the runner and branch-protection requirements needed for reliable deployments.
2026-09-10 11:04:12 +03:30
f34bea05cd perf: optimize portfolio runtime delivery
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
Replace the blocking asset loader with progressive rendering, defer expensive media and Three.js work, and reduce hydration and animation costs. Move deployment from a static Nginx export to the standalone Next.js runtime with optimized dynamic images.
2026-09-09 12:43:37 +03:30
bc2feba49a feat(ci): deploy verified releases with rollback 2026-09-07 00:18:34 +03:30