Commit Graph

3 Commits

Author SHA1 Message Date
990a76a710 fix(ci): sync the server checkout after deployment
All checks were successful
Test and deploy / Verify production build (push) Successful in 4m54s
Fast-forward the deployment checkout to the exact healthy image commit while refusing tracked changes, divergence, or an unexpected branch. Ignore release metadata stored beside the checkout.
2026-09-15 15:22:09 +03:30
24cd86ede7 feat: add route-backed project case studies
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
2026-09-09 22:00:57 +03:30
75c9a62b37 chore: create initial project snapshot
Capture the portfolio source, design references, and production assets with repository-specific ignore rules.
2026-09-04 18:48:55 +03:30