Commit Graph

10 Commits

Author SHA1 Message Date
5b507d7aef feat: use brand logos in sharing options 2026-09-09 23:44:09 +03:30
14acfcef06 test: cover case study gallery and sharing 2026-09-09 23:31:56 +03:30
b87a1be8fc fix: restore case study drawer interactions 2026-09-09 23:17:39 +03:30
24cd86ede7 feat: add route-backed project case studies
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
2026-09-09 22:00:57 +03:30
b3cfcfe057 fix: stabilize portfolio scrolling and loading
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
Remove skeleton swaps and deferred layout estimates, restore reveal state, and use native proximity scrolling for project cards. Also make the Docker build npm registry configurable.
2026-09-09 17:53:48 +03:30
f34bea05cd perf: optimize portfolio runtime delivery
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
Replace the blocking asset loader with progressive rendering, defer expensive media and Three.js work, and reduce hydration and animation costs. Move deployment from a static Nginx export to the standalone Next.js runtime with optimized dynamic images.
2026-09-09 12:43:37 +03:30
d738263ca1 test: cover bilingual static exports 2026-09-08 19:22:07 +03:30
88adced09f feat(footer): implement responsive 3D isometric SVG footer scene with theme tokens
Some checks failed
Test and deploy / Verify production build (push) Has been cancelled
Test and deploy / Deploy production (push) Has been cancelled
2026-09-08 11:31:36 +03:30
0ed36b3c32 feat(footer): add isometric Three.js contact scene 2026-09-07 22:27:44 +03:30
2aa140bbb0 chore(tooling): modernize Next verification setup 2026-09-07 00:18:20 +03:30