# Platform Operations implementation tasks - Status: Not authorized — wait for explicit approval of the revised spec - Canonical plan: `tasks/plan.md` ## Task 0: Approve revision and resolve implementation inputs **Description:** Approve the confirmed manual Qlockify-style intent and resolve every remaining server/runtime/backup/phase-gate decision. **Acceptance criteria:** - [ ] Revised Platform Operations spec is explicitly approved. - [ ] ADRs 0001–0003 match the approved topology, manual release, and font decisions. - [ ] Every remaining decision has a named answer/evidence. **Verification:** Stakeholder approval plus clean documentation review. **Dependencies:** None **Files likely touched:** spec and ADRs only **Estimated scope:** Small ## Task 1: Define safe configuration and release records **Description:** Define tracked placeholders, external protected secrets, deployment locking, and non-secret active/previous release records. **Acceptance criteria:** - [ ] Release record contains three SHAs, local image ids, migration, backup, operator, and health evidence. - [ ] Configuration examples contain no real or plausible secret values. - [ ] Font provenance uses frontend commit/build only; no second asset path exists. **Verification:** Schema/format tests, secret scan, invalid-record tests. **Dependencies:** Task 0 **Files likely touched:** examples/schema/tests/docs, maximum 5 files **Estimated scope:** Medium ## Task 2: Implement PostgreSQL and Redis Compose foundation **Description:** Add pinned PostgreSQL 18 and Redis 7 Alpine, private data network, volumes, authentication, health, resources, and approved Redis AOF choice. **Acceptance criteria:** - [ ] Both services become healthy with explicit limits/tags. - [ ] Neither publishes a host port. - [ ] Redis is excluded from backup and loss does not affect PostgreSQL authority. **Verification:** Compose validation, health, port/network, volume, Redis-loss tests. **Dependencies:** Task 1 **Files likely touched:** Compose/config/tests, maximum 5 files **Estimated scope:** Medium ## Task 3: Implement backend, worker, and one-off boundaries **Description:** Wire API/worker plus separate migration/import/admin commands and graceful lifecycle. **Acceptance criteria:** - [ ] Migration completes before API/worker readiness. - [ ] Normal startup never runs import/admin; import uses one exact read-only path. - [ ] Worker is private/event-driven and uses pinned pre-1.0 Asynq `v0.26.0`. **Verification:** Startup/failure/import-idempotency/shutdown integration tests. **Dependencies:** Task 2 and approved backend commands **Files likely touched:** Compose/service wrappers/tests, maximum 5 files per slice **Estimated scope:** Medium ## Task 4: Implement frontend build and font health **Description:** Build the nested frontend checkout normally and verify static SPA/font output without deployment copies or injection. **Acceptance criteria:** - [ ] Build uses recorded frontend commit at/after `64f5ac2`. - [ ] Expected font resource returns 200 with correct content type. - [ ] Deployment repository contains no font binary, `FontLicense.txt`, fetch, credential, or alternate path. **Verification:** Build/static health plus repository-policy scan. **Dependencies:** Task 1 and approved frontend build contract **Files likely touched:** frontend deployment wrapper/service/tests, maximum 5 files **Estimated scope:** Medium ## Task 5: Implement Nginx and automatic TLS **Description:** Adapt Qlockify's Nginx/Certbot pattern for canonical routing, Let's Encrypt, API/frontend separation, exact SSE behavior, security headers, and health. **Acceptance criteria:** - [ ] Only 80/443 are public; unknown hosts reject and canonical redirect is exact. - [ ] Staging/production issuance and renewal/reload pass. - [ ] SSE heartbeat/reconnect streams without buffering/cache/compression. **Verification:** `nginx -t`, external TLS/header/routing checks, streamed SSE test. **Dependencies:** Tasks 3–4 and approved routes/CSP **Files likely touched:** Nginx/Certbot assets/tests, maximum 5 files per slice **Estimated scope:** Medium ## Checkpoint A: Runtime MVP foundation - [ ] Tasks 1–5 pass from clean nested checkouts. - [ ] Only Nginx is public; migration/import/admin/font/SSE boundaries behave correctly. - [ ] No secret/raw data/runtime/font duplication enters deployment Git. ## Task 6: Adapt Qlockify manual deploy and rollback **Description:** Modify Qlockify's deploy flow for ZarinPal paths/services and three-hash release records while removing unconditional destructive Git synchronization. **Acceptance criteria:** - [ ] Latest `origin/main` is fast-forwarded and three hashes recorded before build. - [ ] Dirty/diverged checkout, pull, build, migration, or health failure preserves the active release. - [ ] Previous hashes rebuild/restore within 15 minutes without automatic down migration. **Verification:** Script tests plus induced staging failures and timed rollback drill. **Dependencies:** Checkpoint A **Files likely touched:** deploy script/release helper/tests/docs, maximum 5 files per slice **Estimated scope:** Medium ## Task 7: Adapt Qlockify encrypted backup/upload **Description:** Reuse Qlockify's PostgreSQL dump, OpenSSL, rclone upload, and retention flow with ZarinPal paths/services/credentials and a non-secret manifest. **Acceptance criteria:** - [ ] Archive/listing/checksums/encryption/remote verification gate success. - [ ] Exactly three verified encrypted local and seven remote backups are retained. - [ ] `.env`, secrets, Redis, TLS, CSV, credentials, logs, monitoring, font, and license are excluded. **Verification:** Fixture database/object-store tests, exclusion inspection, failed-upload/cleanup tests. **Dependencies:** Tasks 1–3 and approved backup inputs **Files likely touched:** adapted backup/upload scripts/tests/docs, maximum 5 files per slice **Estimated scope:** Medium ## Task 8: Adapt Qlockify guarded restore **Description:** Reuse Qlockify download/decrypt/restore flow while requiring explicit backup id, exact destination, empty target, and all production guards. **Acceptance criteria:** - [ ] Every absent/mismatched production factor aborts before mutation. - [ ] No environment/secret/Redis restoration occurs. - [ ] Clean restore passes schema/count/tenant/login/cold-cache/worker/SSE checks within two hours. **Verification:** Disposable-database tests, guard negative matrix, timed rehearsal. **Dependencies:** Task 7 **Files likely touched:** adapted restore scripts/tests/docs, maximum 5 files per slice **Estimated scope:** Medium ## Task 9: Bootstrap and accept MVP server **Description:** Follow the reviewed bootstrap runbook, deploy manually, run one-time data/demo setup, and capture MVP evidence. **Acceptance criteria:** - [ ] Access/firewall/Docker/DNS/TLS/deployment boundaries pass. - [ ] Three-hash release, migration, import, accounts, tenant isolation, worker/SSE, and font pass. - [ ] MVP manual health/log/disk/certificate/queue checks and encrypted backup/restore pass. **Verification:** Completed bootstrap/acceptance record. **Dependencies:** Tasks 6–8 and approved server/window **Files likely touched:** non-sensitive release/evidence records only **Estimated scope:** Operational session ## Checkpoint B: MVP ready - [ ] Every MVP acceptance criterion passes. - [ ] Active/previous three-hash releases and rollback are ready. - [ ] Clean restore meets RPO/RTO. - [ ] Stakeholder explicitly confirms the core project is ready, opening the observability phase. ## Task 10: Add Prometheus and private exporters **Description:** Add post-MVP collection for application, worker/SSE, PostgreSQL/Redis, host/container, backup/restore, and TLS signals. **Acceptance criteria:** - [ ] Required signals appear with bounded labels and retention. - [ ] Prometheus/exporters are private and resource-limited. - [ ] Merchant/user/request/card identifiers are absent from metric labels. **Verification:** Target health, signal/cardinality/resource tests. **Dependencies:** Checkpoint B **Files likely touched:** split into <=5-file monitoring slices **Estimated scope:** Multiple Medium slices ## Task 11: Add Grafana dashboards and alerts **Description:** Add private dashboards, release correlation, actionable symptom alerts, runbook links, and delivery testing. **Acceptance criteria:** - [ ] Service, worker/SSE, data, host, backup, and TLS dashboards answer the spec's operator questions. - [ ] Only page/ticket alerts exist and each is actionable. - [ ] Induced failures alert and can be diagnosed without source archaeology. **Verification:** Dashboard review, induced failure, alert test-fire, redaction check. **Dependencies:** Task 10 **Files likely touched:** split into <=5-file dashboard/alert slices **Estimated scope:** Multiple Medium slices ## Final observability checkpoint before AI - [ ] Prometheus/Grafana phase meets its acceptance criteria. - [ ] Alert delivery and runbook ownership are proven. - [ ] Stakeholder explicitly approves beginning AI implementation. - [ ] No CI/CD pipeline or automated deployment system was introduced.