docs(tasks): record implementation task approval
This commit is contained in:
@@ -4,7 +4,7 @@
|
||||
- Capability: Merchant dashboard
|
||||
- Last updated: 2026-08-20
|
||||
|
||||
Detailed screen-level behavior, representative layouts, content, accessibility, partial-delivery states, and export workflows are specified in [`DASHBOARD-UX-SPEC.md`](DASHBOARD-UX-SPEC.md). Both specifications are approved for implementation planning; implementation still requires approval of the plan, task list, and applicable interface contracts.
|
||||
Detailed screen-level behavior, representative layouts, content, accessibility, partial-delivery states, and export workflows are specified in [`DASHBOARD-UX-SPEC.md`](DASHBOARD-UX-SPEC.md). Both specifications, the Phase 2 plan, and the Phase 3 task list are approved. Implementation remains paused pending a separate explicit authorization and approval of the applicable interface contracts.
|
||||
|
||||
## Objective
|
||||
|
||||
@@ -101,6 +101,6 @@ Resolved specification inputs:
|
||||
Still required before implementation:
|
||||
|
||||
- Approved machine-readable analytics, identity, detail, SSE, error, and CSV export interface contracts.
|
||||
- Product/interface approval for the exact CSV schema, encoding, filename, row cap, delivery, retention, and audit behavior.
|
||||
- Provider contract incorporation of the approved CSV schema, UTF-8 BOM encoding, filename, 100,000-row and 50 MiB caps, synchronous 60-second delivery limit, rate limit, and 30-day audit retention behavior.
|
||||
- Static adapter fallback/routing behavior under the final Nginx configuration.
|
||||
- Approved Phase 2 implementation plan and Phase 3 task list.
|
||||
- Separate explicit authorization to begin Phase 4 implementation.
|
||||
|
||||
Reference in New Issue
Block a user