docs(tasks): record implementation task approval

This commit is contained in:
2026-08-20 18:40:25 +03:30
parent 8b168f7721
commit 98dada4cb0
4 changed files with 11 additions and 8 deletions

View File

@@ -4,7 +4,7 @@
- Capability: Merchant dashboard
- Last updated: 2026-08-20
Detailed screen-level behavior, representative layouts, content, accessibility, partial-delivery states, and export workflows are specified in [`DASHBOARD-UX-SPEC.md`](DASHBOARD-UX-SPEC.md). Both specifications are approved for implementation planning; implementation still requires approval of the plan, task list, and applicable interface contracts.
Detailed screen-level behavior, representative layouts, content, accessibility, partial-delivery states, and export workflows are specified in [`DASHBOARD-UX-SPEC.md`](DASHBOARD-UX-SPEC.md). Both specifications, the Phase 2 plan, and the Phase 3 task list are approved. Implementation remains paused pending a separate explicit authorization and approval of the applicable interface contracts.
## Objective
@@ -101,6 +101,6 @@ Resolved specification inputs:
Still required before implementation:
- Approved machine-readable analytics, identity, detail, SSE, error, and CSV export interface contracts.
- Product/interface approval for the exact CSV schema, encoding, filename, row cap, delivery, retention, and audit behavior.
- Provider contract incorporation of the approved CSV schema, UTF-8 BOM encoding, filename, 100,000-row and 50 MiB caps, synchronous 60-second delivery limit, rate limit, and 30-day audit retention behavior.
- Static adapter fallback/routing behavior under the final Nginx configuration.
- Approved Phase 2 implementation plan and Phase 3 task list.
- Separate explicit authorization to begin Phase 4 implementation.